Powering Mobile Solar.Built for the Frontier.

Where do you need us? Mobile solar power, from one accountable team.

Our Manifesto

Who we are

Mobile and relocatable solar programmes solve a real frontier problem: get daytime megawatts onto a camp or temporary pad without pouring permanent civil works for every module. What they do not solve alone is endurance. Night floors, multi-hour cloud events, process peaks, and contingency islanding still demand thermal firming. Diesel recip fleets are the common Phase 1 answer; remanufactured GE Frame 6B power stations enter when firm megawatts and fuel economics outgrow container gensets.

Mining camps frequently run under a broader environmental management plan. Trailer PV can fit as temporary power inside that plan if layouts, fuel and demobilisation are documented. Crushers, workshops and accommodation each pull different duty cycles — camp in trailer PV for mining camps. Agricultural seasonal pads have their own water and land-use constraints — seasonal agricultural mobile solar.

USP&E manifesto film still
18Live projects in 11 countries
85+Countries guided
35+Countries with completed utility-scale projects
400+Engineers & project managers
ISO9001 & 45001 certified
45 MWFX-45 OCGT · 108 MW CCGT 2×1

How we work

One partner. Complete accountability.

On each trailer, measure solar production, irradiance, battery state of charge and temperature, inverter status and alarms, load served and any fuel or generator data from the firming unit. Add location and tamper alerts for mobile equipment, because trailers that move without warning are a theft and safety concern. Store raw data, not just summaries, so engineers can investigate problems later.

01

Scope

Tell us your load, fuel, frequency (50 or 60 Hz) and target date.

02

Engineer & deliver

We specify the right equipment and execute EPC through commissioning.

03

Operate

Our O&M teams run and maintain the plant with Extreme Ownership for the life of the asset.

Case studies

We prove before we promise
28× KTA50

Perseus Mining · Nyanzaga Gold Project, Tanzania

Mining power · Asset supply

28 Cummins KTA50 containerised gensets, 1,275 kVA each, supplied by USP&E to power the mine.

Talk to the team
104 MW

Mining Power Station Refurbishment in Mali

O&M contract · Barrick

104 MW power station refurbishment achieving 300% reliability improvement for Barrick Gold.

View case study
7× Frame 6B

Major US hyperscale developers

Data center power · Refurbishment

Seven GE Frame 6B gas turbines refurbished to zero hours, in-house, by USP&E.

Talk to the team

What we bring

Not a broker. One accountable EPC & O&M team.

Remote compute sites are exploring hybrids with data-centre power plants alongside solar and storage. A trailer-based triad can prove controls and logistics first, so design your controller and interfaces to scale.

Remote compute sites are starting to combine solar with data-centre power plants. A trailer-based hybrid can serve as the first phase, proving controls and logistics while permanent blocks are planned, so design your controller and electrical interfaces to scale.

We are brand agnostic. We source, deploy and maintain the right OEM technology for every project.

OEM brands USP&E supports

Global reach, local teams

Six offices, one accountable team

USA | AFRICA | UK | UAE | CHINA

Colorado Springs Office1755 Telstar Dr, Suite 300United States
Knoxville Office800 S Gay St, Suite 700United States
London Office162-168 Regent StreetUnited Kingdom
Johannesburg Office22 Kildoon Rd, BryanstonSouth Africa
Cape Town Office31 Brickfield Road, WoodstockSouth Africa
China OfficeNo. 1, Ningzhou Road, WuxiChina

Buying questions, answered

FAQ
What does Mobile Solar Power Trailer focus on?

Mobile Solar Power Trailer focuses on mobile solar power. Mobile solar trailers with thermal firming options for camps and disaster response.

Will USP&E take single-point accountability for hybrid solar + diesel?

Yes. Exclusive EPC/EPCM and optional O&M are designed so clients are not mediating between a solar trailer vendor and a genset broker.

Can O&M follow a trailer fleet to a new country?

Programmes are structured so monitoring, spares logic, and trained crews can relocate with the assets — subject to country compliance and mobilisation planning.

Should I buy a new turbine before solar trailers?

Not always. Many sites prove relocatable solar-hybrid economics first, then add new turbines when firm load and fuel gas justify it. USP&E sequences both under one plan.

Can a used turbine run beside solar trailers?

Yes, when controls, protection, and dispatch are engineered as one hybrid — USP&E’s EPC scope — rather than two independent plants fighting on one bus.

Facing a power challenge on site?

Let’s talk about how USP&E can help. Call +27 10 822 2324 or email info@uspeglobal.com.

Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Mobile Solar Power Trailer is part of USP&E